Grant Thornton Office – West Perth

Grant Thornton Office – West Perth

Design And Construct -22.66mm Toughened Laminated Ceramic Frit Glazing, 17.52mm Toughened Laminated Ceramic Frit Glass Soffit & 15mm Glass DGU Window Retrofit.

Architect: T&Z

Engineer: Peritas

Builder: Total Construction

Scope: 90M² of 17.52mm Toughened Laminated Ceramic frit soffit glazing, 195M² of 22.66mm Toughened Laminated Ceramic Frit vertical glazing (Individual panel size 6×2 meters, 700kgs EACH) & 483M² of 15mm Double Glazing retrofit.

Value: +/- $500,000-00